Solar for your factory, in plain words

Short guides to the two ways to pay for a plant, the papers you’ll need and the questions to ask. They explain; they don’t tell you which to pick.

How a solar loan works for a factory

You borrow to buy the plant, and the plant is yours from the first day. It sits on your books as an asset, and the loan sits there as a debt. You repay the bank each month over the term, often around 5 years.

The power the plant makes cuts your grid bill straight away. While the loan runs, the saving on the bill and the monthly repayment pull against each other. Once the loan is repaid, the saving is all yours for the rest of the plant’s life. Panels usually carry a 25-year maker’s warranty on output.

The bank looks at you, not only at the plant: your accounts, your bank statements, your other loans. It may ask for a margin of your own money, or for security. Upkeep, insurance and cleaning are yours to arrange, since you own the plant.

How ₹0 upfront works

A project company pays for the plant, puts it on your roof and owns it. You pay nothing to build it. Instead you sign a deal to buy the power it makes, priced per unit, for a fixed term, often 6 years or more. The other common form is a lease of the plant, again priced by the unit it makes.

The unit rate is set below what you pay the grid, so your total bill should come down from the first month. The project company looks after the plant during the term, because its income depends on the plant making power. Many deals hand the plant to you at the end, sometimes for a token ₹1. Read that clause closely: it is where deals differ most.

State rules shape what is allowed. Some states allow only a lease priced per unit, not a sale of power. Net metering also has limits: many DISCOMs cap it by sanctioned load, and a common cap is 500 kW. The project file notes your state’s rules, but confirm them with your DISCOM before you sign.

What papers to keep ready

Both routes ask for much the same file. Having it ready saves weeks.

  • Your last 12 months of power bills, with the tariff category and sanctioned load.
  • Three years of audited accounts, and your GST returns.
  • Company details: certificate of incorporation, CIN or LLPIN, GSTIN, and who signs for the company.
  • Proof you own the roof, or the lease with the years left on it.
  • The roof: area, type and age, and any repairs due.
  • An installer’s quote, if you have one, and any draft power deal or lease you have been offered.

On CapGreen, our team checks each paper against the original before your file goes live. Lenders and investors see your papers only after you approve each one.

How to compare two offers

Put the two offers side by side and ask the same questions of each.

  • What do we pay in total over the full term, and what does the grid bill fall to?
  • For a loan: the rate, the term, any fees, the security asked, and the margin we put in.
  • For a power deal or lease: the rate per unit, whether it rises each year and by how much, and the minimum units we must pay for.
  • Who owns the plant, during the term and after it? What does the handover clause say?
  • Who pays for upkeep, insurance and repairs, and how quickly must they fix a fault?
  • What happens if we move, sell the building or want to end early?
  • What does each side owe if the DISCOM changes its rules?

Neither route is right for every factory. Read both with your CA, and ask the bank or project company to put every answer in writing.

These guides explain how each route usually works. They are not advice, and the figures in them are typical examples, not offers. Your real terms come from the bank or project company, in writing.